Started a master bedroom, master bathroom with his & hers walk in closet. Had to raise the floor 8″.
#dcandr #buildout #remodel #Construction #dependabilityfirst
![](https://i0.wp.com/dependableconstruction.com/wp-content/uploads/2020/01/garage_floor3616122105501367029.jpg?resize=1024%2C768&ssl=1)
Started a master bedroom, master bathroom with his & hers walk in closet. Had to raise the floor 8″.
#dcandr #buildout #remodel #Construction #dependabilityfirst
You must be logged in to post a comment.