#Xactimate line item of the day, Ice and Water Shield (RFG IWS). Standard Calculation = (EAVE*6)
Note: 2 Rows must be installed at the eave for overhangs 4″ or greater in order to meet the code requirement. Includes: #Ice and #water shield and installation labor. Quality: Peel and stick with modified bitumen base.
Note: Common applications for ice and water shield include along eaves, rakes; around chimneys, pipe jacks, roof vents, skylights/roof windows, valley lining; etc.

#insurance #dcandr #roofing #dependabilityfirst

Share This