Close view of the 4×8 sheet of osb that was installed. We took extra time to ensure that every screw that was installed through the board hit a stud.
#dcandr #interiordamage #dependabilityfirst #roofing
Close view of the 4×8 sheet of osb that was installed. We took extra time to ensure that every screw that was installed through the board hit a stud.
#dcandr #interiordamage #dependabilityfirst #roofing